Technical & Construction Pack

Pack 3 of 4 · RIBA Stage 4

Planning permission tells you what you can build. The technical design tells the builder exactly how to build it. Our Technical & Construction Pack prepares the detailed drawings and specification your project needs to comply with the Building Regulations, to obtain accurate quotes from contractors and to be built as designed.

  • Comply with current Building Regulations through a coordinated technical design
  • Compare contractors like for like with a clear tender package
  • Keep control on site with support through construction

Book your free initial consultation

Architect and contractor reviewing construction drawings on site
Illustrative image

What the Technical & Construction Pack includes

  • Technical design for Building Regulations: structure, fire safety, ventilation, energy efficiency, overheating and access
  • Construction drawings and details
  • Coordination with the structural engineer and other consultants
  • Building Control application to the local authority or a registered building control approver
  • Specification and tender package: the schedule of works contractors price against
  • Tender and contractor selection: like-for-like comparison of quotes
  • Building contract and programme support
  • Site visits and support during construction
  • Principal Designer services under CDM 2015, where required
  • Detailed budget updated with the contractors’ prices

How it works

  1. Technical design: we develop the approved design into construction drawings and details, coordinated with the structural engineer.
  2. Building Control: we prepare and submit the Building Regulations application and respond to the building control body.
  3. Tender: we send the tender package to selected contractors, compare the returned prices and help you appoint the right builder.
  4. Construction: we support you on site, answer the contractor’s queries and check that the works follow the design, with the level of involvement agreed with you.

Learn more about our planning and Building Regulations drawings and Principal Designer services.

Construction site with crane and site managers
Illustrative image

Full budget visibility from the first stage

From the Feasibility & Concept Design Pack onwards, you receive an indicative budget that covers not only the construction costs but also the professional and statutory fees your project will need. As the design develops, the estimate becomes progressively more detailed and accurate, so you stay in control of your budget at every stage and can make decisions with the full picture in front of you.

Frequently Asked Questions

Which RIBA stages does this pack cover?
RIBA Stage 4 (Technical Design) and Stage 5 (Manufacturing and Construction) of the RIBA Plan of Work.

Do I need Building Regulations approval if I have planning permission?
Yes. Planning permission and Building Regulations approval are separate. Most extensions, loft conversions and conversions need Building Regulations approval, even when they are permitted development.

What is a tender package?
A set of drawings, specification and schedule of works that describes the project in detail, so that different contractors price exactly the same works and their quotes can be compared fairly.

Why are detailed drawings important for the budget?
The more detailed the drawings and specification, the more accurate the contractors’ prices, and the lower the risk of extra costs and disputes during construction.

Do you visit the site during construction?
Yes. We offer site visits and support during construction, with the level of involvement agreed with you at the start.

Book your free initial consultation

As a RIBA Chartered Practice, we work closely with private clients, property developers, and commercial partners—guiding them from concept to completion with innovative, tailored architectural solutions that bring their visions to life.